Skip to content

fix: QA bug fixes and improvements for v1.0.0 #3

fix: QA bug fixes and improvements for v1.0.0

fix: QA bug fixes and improvements for v1.0.0 #3

Triggered via push March 2, 2026 23:56
Status Failure
Total duration 1m 48s
Artifacts –

test.yml

on: push
Matrix: Run Tests
Fit to window
Zoom out
Zoom in

Annotations

11 errors
Run Tests (ubuntu-latest, stable)
Process completed with exit code 1.
Run Tests (macos-latest, beta)
The strategy configuration was canceled because "test.ubuntu-latest_stable" failed
Run Tests (macos-latest, beta)
The operation was canceled.
Run Tests (ubuntu-latest, beta)
The strategy configuration was canceled because "test.ubuntu-latest_stable" failed
Run Tests (ubuntu-latest, beta)
The operation was canceled.
Run Tests (macos-latest, stable)
The strategy configuration was canceled because "test.ubuntu-latest_stable" failed
Run Tests (macos-latest, stable)
The operation was canceled.
Run Tests (windows-latest, beta)
The strategy configuration was canceled because "test.ubuntu-latest_stable" failed
Run Tests (windows-latest, beta)
The operation was canceled.
Run Tests (windows-latest, stable)
The strategy configuration was canceled because "test.ubuntu-latest_stable" failed
Run Tests (windows-latest, stable)
The operation was canceled.